logo logo European Journal of Educational Research

EU-JER is a leading, peer-reviewed research journal that provides an online forum for studies in education by and for scholars and practitioners worldwide.

Subscribe to

Receive Email Alerts

for special events, calls for papers, and professional development opportunities.

Subscribe

Publisher (HQ)

Eurasian Society of Educational Research
Eurasian Society of Educational Research
Christiaan Huygensstraat 44, Zipcode:7533XB, Enschede, THE NETHERLANDS
Eurasian Society of Educational Research
Headquarters
Christiaan Huygensstraat 44, Zipcode:7533XB, Enschede, THE NETHERLANDS
Research Article

Extended School Time: Impact on Learning and Teaching

Pedro Cabral Mendes , Cristina Rebelo Leandro , Francisco Campos , Miguel Fachada , Ana Paula Santos , Ricardo Gomes

This paper presents and assesses the effects of an Extended School Time project (ESTp), with a working day of 8 contact hours, that aimed to develop t.


  • Pub. date: January 15, 2021
  • Pages: 353-365
  • 1408 Downloads
  • 5499 Views
  • 2 Citations

How to Cite

Abstract:

T

This paper presents and assesses the effects of an Extended School Time project (ESTp), with a working day of 8 contact hours, that aimed to develop the students as a whole in its academic, artistic, sport, social and human dimensions. Based in active and integrated pedagogical practices, the project promoted the integration of knowledges, curiosity, sense of criticism, creativity, sharing solidarity and the conviviality of students. This project was applied to a 6th grade class with 20 pupils (11.2±0.68 years old). Using a qualitative methodology, 13 semi structured interviews were applied to 3 types of participants: 6 pupils, 5 parents (42.6±4.54 years old) and 2 teachers (60±4 years old), in order to analyze their perceptions regarding the project. Results show that each group valued different aspects of the project. The pupils valued activities that emphasized challenge, communication, creativity, and autonomy, as well as activities of academic continuity. The parents focused mostly on the occupational component of Extended School Time (ESTp), and the teachers on its effects on social and self-development of the pupils. This development was reflected in an improved peer-to-peer relationship and in a greater sense of belonging to school. The convergence verified in this ESTp, between cognition and the artistic, social and sport education, sought to promote the main goal of the School, an instruction that promotes a global (including multicultural and universal) development of the pupils’ capabilities.

Keywords: Full-time school, integral education, lower secondary education, qualitative research.

description PDF
file_save XML
Article Metrics
Views
1408
Download
5499
Citations
Crossref
2

Scopus
2

References

Alonso-Tapia, J. (2006). Clima motivacional de clase: Características, efectos y determinantes.[Class motivational environment: Characteristics, effects and determinants] In F. H. Veiga (Ed.), Envolvimento dos Alunos na Escola: Perspetivas da Psicologia e Educação — Motivação para o Desempenho Académico [Students’ involvement in School: Psychological and Educational Perspectives – Motivation for Academic Performance]. Universidade de Lisboa, Instituto de Educação.

Andersen, S. C., Humlum, M. K., & Nandrup, A.B. (2016). Increasing instruction time in school does increase learning. Proceedings of the National Academy of Sciences, 113(27), 7481–7484. https://doi.org/10.1073/pnas.1516686113

Babayigit, O. (2019). Examining the effect of creative writing activities on reading, writing and language lesson attitudes of elementary school fourth grade students. European Journal of Educational Research, 8(1), 213-220. https://doi.org/10.12973/eu-jer.8.1.213

Balaguer, A., Nenítez, E., Albertos, A., & Lara, S. (2020). Not everything helps the same for everyone: relevance of extracurricular activities for academic achievement. Humanities and Social Sciences Communications, 7(79), 1-8. https://doi.org/10.1057/s41599-020-00573-0.

Bardin, L. (2008). Análise de conteúdo [Content Analysis] (5th ed). Edições 70.

Bohnert, A., Fredricks, J., Randall, E. (2010) Capturing unique dimensions of youth organized activity involvement: theoretical and methodological considerations. Review of Educational Research, 80 (4), 576–610. https://doi.org/10.3102/0034654310364533

Cañabate, D., Serra, T., Bubnys, R., & Colomer, J. (2019). Pre-Service teachers’ reflections on cooperative learning: Instructional approaches and identity construction. Sustainability, 11(21), 1-18. https://doi.org/10.3390/su11215970

Caride, J., Gradaílle, R., & Caballo, M. (2015). De la pedagogía social como educación, a la educación social como Pedagogía [From social pedagogy as education to social education as pedagogy]. Pedagogía social y educación social, 37(148), 4‑11.

Chan, Y. -K. (2016). Investigating the relationship among extracurricular activities, learning approach and academic outcomes: A case study. Active Learning in Higher Education, 17(3), 223-233.. https://doi.org/10.1177/1469787416654795

Cone, T., & Cone, S. (2005). Teaching children dance. Human Kinetics.

Cruz, A. (2016). Déjeuner sur l’Herbe com Alguém a Afogar-se. [Breakfast over The Herbe, with somebody drowning] In J. Fanha, (Ed.), Uma Terra prometida – Contos sobre refugiados [A promised Land – tales of refugees] (pp. 9-16). Zero a Oito.

Cuban, L. (2008). The perennial reform: Fixing school time. Phi Delta Kappan, 90(4), 240-250.

Darling, N. (2005) Participation in extracurricular activities and adolescent adjustment: cross-sectional and longitudinal findings. Journal of Youth and Adolescence, 34(5), 493–505. https://doi.org/10.1007/s10964-005-7266-8

Davies, T. (2013). Incorporating creativity into teachers practice and self-concept of professional identity. Journal of Educational Change, 14(1), 51-71.

Dewey, J. (1979). Como Pensamos como se Relaciona o Pensamento Reflexivo com o Processo Educativo: uma reexposição. [How we think, How does Reflexive thinking relates with the educational process: a review] (H. C. Campos. Trans., 4th ed.). Atualidades Pedagógicas.

Ehren, M. C. M., & Visscher, A. J. (2008). The relationship between school inspections, school characteristics and school improvement. British Journal of Educational Studies, 56(2), 205–227.

Eigenschenk, B, Thomann, A., McClure, M., Davies, L., Gregory, M., Dettweiler, U., & Inglés, E. (2019). Benefits of outdoor sports for society. A Systematic Literature Review and Reflections on Evidence. International Journal of Environmental Research and Public Health, 16(6), 1-21. https://doi.org/10.3390/ijerph16060937

Fairbman, D., & Kaplan, C. (2005). Time for a chance: The promise of extended-time schools for promoting student achievement. Massachussets Education 2020.

Feldman, A. F., & Matjasko, J. L. (2005). The role of school-based extracurricular activities in adolescent development: A comprehensive review and future directions. Review of Educational Research, 75(2), 159–210. https://doi.org/10.3102/00346543075002159

Fialho, I., Verdasca, J., Moreira, L., Chaleta, E., Grácio, L., Magalhães, O., Saragoça, S., Cid, M., & Tobias, A. (2013). Avaliação externa do programa de atividades de enriquecimento curricular no 1º ciclo do ensino básico [External assessment of the Curricular Enrichment Activities program for primary education]. Centro de Investigação em Educação e Psicologia da Universidade de Évora.

Fonseca, R., Silva, P., & Silva, R. (2007). Acordo inter-juízes: O caso do coeficiente kappa [Inter-judges agreement: the case of Kappa coefficient]. Psychology Laboratory/ Laboratório de Psicologia, 5(1), 81-90.

Freinet, C. (2004). Pedagogia do bom senso [Good sense Pedagogy] (7th ed.).  Martins Fontes.

Fullan, M. (2007). The new meaning of educational change. Teachers College Press.

Gadotti, M. (2009). Educação integral no Brasil: Inovações em processo [Integral Education in Brasil: Current innovations]. Editora e Livraria Instituto Paulo Freire.

Galian, C., & Sampaio, M. (2012). Educação em tempo integral: Implicações para o currículo da escola básica [Full-time school: Implications for the school curriculum]. Currículo sem Fronteiras, 12(2), 403-422.

Gijselaers, W. H., & Schimdt, H. (1995). Effects of Quantity of Instruction on Time spent on learning and achievement. Educational Research and Evaluation, 1(2), 183-201.

Gimeno, J. (2009). El valor del tiempo en educación [The value of time in education]. Ediciones Morata

Grando, R. C. (2004). O jogo e a Matemática no contexto da sala de aula [The game and Mathematics within the classroom]. Editora Paulus.

Gromada, A., & Shewbridge, C. (2016). Student Learning Time: A Literature Review (OECD Education Working Papers, No. 127). OECD Publishing. https://doi.org/10.1787/5jm409kqqkjh-en

Hansen, D. M., Larson, R. W., & Dworkin, J. B. (2003). What adolescents learn in organized youth activities: A survey of self-reported developmental experiences. Journal of Adolescent Research, 13(1), 25–55. https://doi.org/10.1111/1532-7795.1301006

Hargreaves, A., & Shirley, D. (2009). The fourth way: The inspiring future for educational change. Corwin.

Harnischfeger, A., & Wiley, D. E. (1976). The teaching-learning process in elementary schools: A synoptic view. Curriculum Inquiry, 6(1), 5-43.

Hill, M. M., & Hill, A. (2002). Investigação por questionário [Research by questionnaire] (2nd ed.). Edições Sílabo.

Hirsch, B.J., Deutsch, N.L., DuBois, D.L. (2011) After-school centers and youth development: Case studies of success and failure. Cambridge University Press.

Im, M.H., Hughes, J.N., Cao, Q., & Kwok, O.M. (2016) Effects of extracurricular participation during middle school on academic motivation and achievement at Grade 9. American Educational Research Journal, 53(5), 1343–1375. https://doi.org/10.3102/0002831216667479

Karacabey, M. F., Ozdere, M., & Bozkus, K. (2019). The attitudes of teachers towards multicultural education. European Journal of Educational Research, 8(1), 383-393. https://doi.prg/10.12973/eu-jer.8.1.383

Kearns, R. M. (2009). Voice of Authority: Theorizing Creative Writing Pedagogy. College Composition and Communication, 60(4), 790-807.

Kishimoto, T. M. (2000). Jogo, brinquedo, brincadeiras e a educação [The games, toys and education] (4th ed.). Editora Cortez.

Lavy, V. (2015). Do differences in schools' instruction time explain international achievement gaps? Evidence from developed and developing countries. The Economic Journal, 125(588), 397-424. https://doi.org/10.1111/ecoj.12233

Litwin, M. (1995). The survey kit: How to measure survey reliability and validity. Sage.

López-Agudo, L.A., & Marcenaro Gutiérrez, O. D. (2018). The Effect of Weekly Instruction Time on Academic. Review of Public Economics/  Hacienda Pública Española, 230(3/2019), 63-93. https://doi.org/10.7866/hpe-rpe.19.3.3

Lynch, K., & Baker, J. (2005). Equity in education: An equality of condition perspective. Theory and Research in Education, 3(2), 131–164.

European Commission. (2004). Changes in regulation modes and social production of inequalities in education systems: A European comparison. https://cordis.europa.eu/project/id/HPSE-CT-2001-00086  

Mendes, C. P., Leandro, C., Campos, F., Parreira, P., & Mónico, L. (2018b). Projeto de Escola a Tempo Inteiro para o 6.º Ano de Escolaridade: “O Pirata do Ulisses” [Full-time school project for grade 6: “Ulisses’ Pirate”]. Portuguese Journal of Pedagogy/ Revista Portuguesa de Pedagogia, 52(2), 47-67.

Mendes, P.C, Leandro, C., Campos, F, Mónico, L., Parreira, P., & Gomes, R. (2019). Interdisciplinary and intergenerational project, Ulisses’ pirate: An empirical study in the context of basic education. Journal of Interdisciplinary Studies in Education, 9(1), 63-75.

Mendes, P. C., Correia, A., Leite, I., Barreto & Barros, R. (2018a). Diário de bordo: uma ferramenta pedagógica [Class Logbook: a pedagogical tool]. In R. P. Lopes, M. V. Pires, L. Castanheira, E. M. Silva, G. Santos, C. Mesquita, P. F. Vaz (Eds.), III Encontro Internacional de Formação na docência (INCTE): Livro de Actas (pp. 646-754). Bragança.

Ministry of Education/General Directorate of Education (2017). Perfil de alunos à saída da Escolaridade Obrigatória. [Students’ profile at the end of obligatory school]. Editorial do Ministério da Educação e da Ciência. https://www.dge.mec.pt/sites/default/files/Curriculo/Projeto_Autonomia_e_Flexibilidade/perfil_dos_alunos.pdf

Monteiro, E. (2007). Experiências criativas do movimento: Infinita curiosidade [Creative movement experiences: Infinite curiosity]. In M. Moura & E. Monteiro (Eds.), Dança em contextos educativos [Dance in educational contexts] (pp.179-191). Edições FMH.

Nunan, D. (1991). Language teaching methodology. Prentice Hall International.

Organisation for Economic Co-operation and Development. (2014). Indicator D1: How much time do students spend in the classroom? In Education at a Glance 2014: OECD Indicators. OECD Publishing. https://doi.org/10.1787/888933119530

Paro, V. H. (2009). A escola pública de tempo integral: Universalização do ensino e problemas sociais [Public full-time school: Universalization of teaching and social problems]. Research Notebooks/ Cadernos de Pesquisa, 29, 86-99.

Patall, E., Cooper, H., & Batts, A. (2010). Extending the school day or school year: A systematic review of research (1985-2009). Review of Educational Research, 80(3), 401-436.

Richards, J. C., (2006). Communicative language teaching today. Cambridge University Press.

Rivkin, S. G., & Schiman, J.C. (2015). Instruction time, classroom quality, and academic achievement. The Economic Journal, 125(588), 425–448, https://doi.org/10.1111/ecoj.12315

Robinson, K., Minkin,L., Bolton, E., French, D., Fryer, L., Greenfield, S., Hannon, V., Henry, L., Holgate, D., Imison, I., Jones, C. Kelly, J., Kroto, H., Moser, C., Rattle, S., Blackheath, L.S., Storey, H., & Traynor, C. (1999). All our futures: Creativity, culture and education. National Advisory Committee on Creative and Cultural Education. http://sirkenrobinson.com/pdf/allourfutures.pdf

Rozimela, Y. (2020). Developing teachers’ professionalism through school initiative-based lesson study. European Journal of Educational Research, 9(4), 1513-1526. https://doi.org/10.12973/eu-jer.9.4.1513

Scher, A., & Verrall, C. (1987) 100+Ideas for Drama (8th ed). Heinemann Educational Books

Shaffer, M. L. (2019) Impacting Student Motivation: Reasons for not eliminating extracurricular activities. Journal of Physical Education, Recreation & Dance, 90(7), 8-14. https://doi: 10.1080/07303084.2019.1637308

Silveira, R., & Maria Hessel (1991). Interação de experiências de vida, leitura e produção textual. Relatório de pesquisa [Interaction of life experiences, Reading and text production. Research report]. UFRGS, Faculdade de Educação, Programa Pericampus.

Skinner, E. A., & Pitzer, R. (2012). Developmental dynamics of student engagement, coping and everyday resilience. In S. L. Christenson, A. L. Reschly & C. A. Wylie (Eds.), The handbook of research on student engagement (pp. 21-44). Springer Science.

Stuart M, Lido C, Morgan J, Solomon, L, & May, S. (2011). The impact of engagement with extracurricular activities on the student experience and graduate outcomes for widening participation populations. Active Learning in Higher Education, 12(3), 203–15.

Trindade, R., & Cosme, A. (2010). Educar e Aprender na escola: Questões, desafios e respostas pedagógicas [Teach and Learn at School: questions, challenges and pedagogical solutions]. Fundação Manuel Leão.

United Nations Educational, Scientific and Cultural Organization. (2010). Estudio de caracterización de las escuelas de tiempo completo (ETC) en México: Encuesta a directores y equipos estatales [Characterization study of full-time schools in Mexico: Enquiry to school headmasters and state teams]. IPPE-UNESCO.

United Nations Educational, Scientific and Cultural Organization. (2016). Educación para transformar vidas. Metas, opciones de stratégia e indicadores [Education to transform lives. Goals, strategic options and indicators]. Oficina Regional de Educación para América Latina y el Caribe.

Vandell, D. L., Larson, R. W., Mahoney, J. L., & Watts, T. W. (2015) Children’s organized activities. In M. H. Bornstein, T. Leventhal, & R. Lerner (Eds.), Handbook of child psychology and developmental science (pp. 1–40). Wiley.

Vygotsky, L. S. (2001). Psicologia pedagógica [Psychological pedagogy]. Martins Fontes.

Walberg, H. J. (1981). A psychological theory of educational productivity. In F. H. Harley & N. Gordon (Eds.), Psychological and education (pp. 81-110). National Society for the Study of Education.

Woessmann, L. (2010). Institutional determinants of school efficiency and equity: German states as a microcosm for OECD countries. Journal of Economics and Statistics, 230(2), 234-270. https://doi.org/10.1515/jbnst-2010-0206

Yousaf, M., Umar, H., & Habib, A. (2017). Communicative language teaching (CLT), role of grammar and teachers’ beliefs. Journal of Research in Social Sciences, 5(1), 116-123.

...